Extra Standard construction with cable ladder of the ceiling type

Overview

Example of the Extra Standard construction with cables in a cable ladder of the ceiling type- tested with the cables of TECHNOKABEL.

Fastening with a threaded rod to the ceiling:

  • indirectly with the USOV grip and PSROM10 expandable sleeve bolt to the ceiling;
  • directly with the TRSOM10 expandable sleeves - no USOV grip required for a sleeve sunk min. 60 mm into the concrete foundation..

Extra Standard spacing of cable ladder rungs: 300 mm.

Extra Standard spacing of supports: 1,5 m.

Maximum load;20 kg/m.

Back to top ↑

Set elements

O.no. Product Symbol Item number Pcs in suspension
1 DUP/DUOP...H60 Cable Ladder DUP/DUOP400H60/3 466340
1
 / 
3,0 m
2 LDC/LDOCH60 Straight Connector LDC/LDOCH60 461001
2
 / 
3,0 m
3 SGK... Screw Set SGKM8x14 651241
8
 / 
3,0 m
4 ZM/ZMO Hold Down Clamp ZM/ZMO 400700
2
 / 
1,5 m
5 WMC/WMCO... Bracket WMC/WMCO400 711140
1
 / 
1,5 m
6 UPW/UPWO Rod Grip UPW/UPWO 750100
1
 / 
1,5 m
7 PGM... Threaded Rod PGM10/1 651001
1
 / 
1,5 m
8 USV/USOV Rod Hanger USV/USOV 750709
1
 / 
1,5 m
9 PP... Washer PP10 650544
4
 / 
1,5 m
10 NS... Nut NSM10 650244
4
 / 
1,5 m
11 SGK... Screw Set SGKM8x14 651241
4
 / 
1,5 m
12 WPCW/WPCO... Ceiling Bracket WPCW/WPCO400 750640
1
 / 
1,5 m
13 SM... Skrutka (komplet) SMM10x30 650843
2
 / 
1,5 m
14 PSRO... Anchor Bolt PSROM10x80 804100
3
 / 
1,5 m
As alternative to the complete set
15 PP... Washer PP10 650544
2
 / 
1,5 m
16 NS... Nut NSM10 650244
2
 / 
1,5 m
17 TRSO... Drop-In Anchor - Steel TRSOM10 804800
1
 / 
1,5 m
Add selected to the project Add all to the project
Specify cable channel length [m]:
Calculate
Back to top ↑

Examples

Example of the Extra Standard construction with cables in a cable ladder of the ceiling type- tested with the cables of TECHNOKABEL.

    Extra Standard spacing of cable ladder rungs:: 300 mm.

    Extra Standard spacing of supports: 1,5 m.

    Maximum load:  20 kg/m.

    Fastening with a threaded rod to the ceiling:

    • indirectly with an USOV grip and PSROM10 expandable sleeve bolt to the ceiling;
    • directly with the TRSOM10 expandable sleeves - no USOV grip required for a sleeve sunk min. 60 mm into the concrete foundation

    Back to top ↑