Extra Standard construction with cable ladder of the ceiling-ceiling type

Overview

Example of the Extra Standard construction with cables in a cable ladder of the ceiling-ceiling type- tested with the cables of TECHNOKABEL.

Fastening with a threaded rod to the ceiling:

  • indirectly with an USOV grip and PSROM10 expandable sleeve bolt to the ceiling;
  • directly with the TRSOM10 expandable sleeves - no USOV grip required for a sleeve sunk min. 60 mm into the concrete foundation.

Extra Standard spacing of cable ladder rungs: 300 mm.

Extra Standard spacing of supports: 1,5 m.

Maximum load;20 kg/m.

Back to top ↑

Set elements

O.no. Product Symbol Item number Pcs in suspension
1 DUP/DUOP...H60 Cable Ladder DUP/DUOP400H60/3 466340
1
 / 
3,0 m
2 LDC/LDOCH60 Straight Connector LDC/LDOCH60 461001
2
 / 
3,0 m
3 SGK... Screw Set SGKM8x14 651241
8
 / 
3,0 m
4 ZM/ZMO Hold Down Clamp ZM/ZMO 400700
2
 / 
1,5 m
5 WFL/WFLO... Bracket WFL/WFLO500 720150
1
 / 
1,5 m
6 WFL/WFLO... Bracket WFL/WFLO400 720140
1
 / 
1,5 m
7 PD11 Spacer PD11 803100
1
 / 
1,5 m
8 PGM... Threaded Rod PGM10/1 651001
1
 / 
1,5 m
9 USV/USOV Rod Hanger USV/USOV 750709
1
 / 
1,5 m
10 PP... Washer PP10 650544
4
 / 
1,5 m
11 NS... Nut NSM10 650244
4
 / 
1,5 m
12 SGK... Screw Set SGKM8x14 651241
2
 / 
1,5 m
13 SM... Skrutka (komplet) SMM10x20 650743
2
 / 
1,5 m
14 PSRO... Anchor Bolt PSROM10x80 804100
2
 / 
1,5 m
15 TRSO... Drop-In Anchor - Steel TRSOM10 804800
1
 / 
1,5 m
As alternative to the complete set
16 PP... Washer PP10 650544
2
 / 
1,5 m
17 NS... Nut NSM10 650244
2
 / 
1,5 m
Add selected to the project Add all to the project
Specify cable channel length [m]:
Calculate
Back to top ↑

Examples

Example of the Extra Standard construction with cables in a cable ladder of the ceiling-ceiling type -tested with the cables of TECHNOKABEL.

Extra Standard spacing of cable ladder rungs: 300 mm.

Extra Standard spacing of supports : 1,5 m.

Maximum load: 20 kg/m.

Fastening with a threaded rod to the ceiling :

  • indirectly with an USOV grip and PSROM10 expandable sleeve bolt to the ceiling;
  • directly with the TRSOM10 expandable sleeves - no USOV grip required for the sleeve placed min. 60 mm into the concrete foundation.

 

Back to top ↑